Blitz says that they will have their SC done by the end of the year, and Alpine sent me an e-mail that states that their SC will be done May-June 03. No prices as of yet, and these time frames seem to still be just an estimation.
(03 Vibe GT monotone Abyss) Progress 2.2 lowering Springs, Freedom Design tie bar, AEM cold air intake. Borla Catback system, Progress Rear Sway Bar,Pioneer DEH-P8400MP cd/mp3 player. Rockford 1000w amp, dual RF PUNCH 10"'s.